Showing posts with label summary. Show all posts
Showing posts with label summary. Show all posts

Monday, March 26, 2012

Scheduling a summary Stored Procedure

I had stored procedure[this read the data from couple of table and summarize
them based on the input paramter] which needs to be executed for every half
hour.I need to pass some input parameter to that proc. I am planning to
schedule this proc using below system procs
sp_add_jobschedule
sp_add_job
I need to pass some input parameter to the stored proc. I need give start
interval and end interval and some configurable values[int 1...int 5) to
filter out columns. These values can be modifiable by the end user
i.e exec my _storedpoc(startinterval, endinterval, int1, int2, int3,
int5...)
How do I pass this input params to my stored proc, when I shceduled .?
Is it the right approch to do this kind of summary procedure ?
Thanks in advance for your thoughts and comments appreciate it
prabhu
If the procedure you need to run have changing parameters' values, what
application supplies the parameters' values? That application should be the
job scheduled (within SQL server or outside).
If you have a few sets of such values that are fed to the same stored proc
to be run at different time, you can create separate jobs, each has its own
schedule and parameter values.
"prabhu" <prabahar.ignatius@.inin.com> wrote in message
news:uvHi57LnEHA.2216@.TK2MSFTNGP10.phx.gbl...
> I had stored procedure[this read the data from couple of table and
summarize
> them based on the input paramter] which needs to be executed for every
half
> hour.I need to pass some input parameter to that proc. I am planning to
> schedule this proc using below system procs
> sp_add_jobschedule
> sp_add_job
> I need to pass some input parameter to the stored proc. I need give start
> interval and end interval and some configurable values[int 1...int 5) to
> filter out columns. These values can be modifiable by the end user
> i.e exec my _storedpoc(startinterval, endinterval, int1, int2, int3,
> int5...)
> How do I pass this input params to my stored proc, when I shceduled .?
> Is it the right approch to do this kind of summary procedure ?
> Thanks in advance for your thoughts and comments appreciate it
> prabhu
>
>
|||Thank for the response Ran.
Most of the time parameters are going to have same value. But I cannot hard
code these values. Instead I need to read it from the file[ or Is there
place I can keep the values for the stored proc parameter.?] and invoke my
summary proc.
So the approach should be, the SP which is feeding the value should be
scheduled which intern call the summary procedure. Let me know if you have
any thoughts...
"Quentin Ran" <xyz@.abc.com> wrote in message
news:ezt3LrOnEHA.536@.TK2MSFTNGP11.phx.gbl...
> If the procedure you need to run have changing parameters' values, what
> application supplies the parameters' values? That application should be
the
> job scheduled (within SQL server or outside).
> If you have a few sets of such values that are fed to the same stored proc
> to be run at different time, you can create separate jobs, each has its
own[vbcol=seagreen]
> schedule and parameter values.
>
> "prabhu" <> wrote in message
> news:uvHi57LnEHA.2216@.TK2MSFTNGP10.phx.gbl...
> summarize
> half
start
>
|||Or rather, you want to set up a table which holds the parameter values.
Your job will query the table to construct the code.
"prabhu" <prabahar.ignatius@.inin.com> wrote in message
news:OQk2W3OnEHA.3324@.TK2MSFTNGP15.phx.gbl...
> Thank for the response Ran.
> Most of the time parameters are going to have same value. But I cannot
hard
> code these values. Instead I need to read it from the file[ or Is there
> place I can keep the values for the stored proc parameter.?] and invoke
my[vbcol=seagreen]
> summary proc.
> So the approach should be, the SP which is feeding the value should be
> scheduled which intern call the summary procedure. Let me know if you have
> any thoughts...
>
> "Quentin Ran" <xyz@.abc.com> wrote in message
> news:ezt3LrOnEHA.536@.TK2MSFTNGP11.phx.gbl...
> the
proc[vbcol=seagreen]
> own
to[vbcol=seagreen]
> start
to
>

Scheduling a summary Stored Procedure

I had stored procedure[this read the data from couple of table and summarize
them based on the input paramter] which needs to be executed for every half
hour.I need to pass some input parameter to that proc. I am planning to
schedule this proc using below system procs
sp_add_jobschedule
sp_add_job
I need to pass some input parameter to the stored proc. I need give start
interval and end interval and some configurable values[int 1...int 5) to
filter out columns. These values can be modifiable by the end user
i.e exec my _storedpoc(startinterval, endinterval, int1, int2, int3,
int5...)
How do I pass this input params to my stored proc, when I shceduled .?
Is it the right approch to do this kind of summary procedure ?
Thanks in advance for your thoughts and comments appreciate it
prabhuIf the procedure you need to run have changing parameters' values, what
application supplies the parameters' values? That application should be the
job scheduled (within SQL server or outside).
If you have a few sets of such values that are fed to the same stored proc
to be run at different time, you can create separate jobs, each has its own
schedule and parameter values.
"prabhu" <prabahar.ignatius@.inin.com> wrote in message
news:uvHi57LnEHA.2216@.TK2MSFTNGP10.phx.gbl...
> I had stored procedure[this read the data from couple of table and
summarize
> them based on the input paramter] which needs to be executed for every
half
> hour.I need to pass some input parameter to that proc. I am planning to
> schedule this proc using below system procs
> sp_add_jobschedule
> sp_add_job
> I need to pass some input parameter to the stored proc. I need give start
> interval and end interval and some configurable values[int 1...int 5) to
> filter out columns. These values can be modifiable by the end user
> i.e exec my _storedpoc(startinterval, endinterval, int1, int2, int3,
> int5...)
> How do I pass this input params to my stored proc, when I shceduled .?
> Is it the right approch to do this kind of summary procedure ?
> Thanks in advance for your thoughts and comments appreciate it
> prabhu
>
>|||Thank for the response Ran.
Most of the time parameters are going to have same value. But I cannot hard
code these values. Instead I need to read it from the file[ or Is there
place I can keep the values for the stored proc parameter.?] and invoke my
summary proc.
So the approach should be, the SP which is feeding the value should be
scheduled which intern call the summary procedure. Let me know if you have
any thoughts...
"Quentin Ran" <xyz@.abc.com> wrote in message
news:ezt3LrOnEHA.536@.TK2MSFTNGP11.phx.gbl...
> If the procedure you need to run have changing parameters' values, what
> application supplies the parameters' values? That application should be
the
> job scheduled (within SQL server or outside).
> If you have a few sets of such values that are fed to the same stored proc
> to be run at different time, you can create separate jobs, each has its
own
> schedule and parameter values.
>
> "prabhu" <> wrote in message
> news:uvHi57LnEHA.2216@.TK2MSFTNGP10.phx.gbl...
> > I had stored procedure[this read the data from couple of table and
> summarize
> > them based on the input paramter] which needs to be executed for every
> half
> > hour.I need to pass some input parameter to that proc. I am planning to
> > schedule this proc using below system procs
> > sp_add_jobschedule
> > sp_add_job
> > I need to pass some input parameter to the stored proc. I need give
start
> > interval and end interval and some configurable values[int 1...int 5) to
> > filter out columns. These values can be modifiable by the end user
> > i.e exec my _storedpoc(startinterval, endinterval, int1, int2, int3,
> > int5...)
> > How do I pass this input params to my stored proc, when I shceduled .?
> > Is it the right approch to do this kind of summary procedure ?
> > Thanks in advance for your thoughts and comments appreciate it
> >
> > prabhu
> >
> >
> >
> >
>|||Or rather, you want to set up a table which holds the parameter values.
Your job will query the table to construct the code.
"prabhu" <prabahar.ignatius@.inin.com> wrote in message
news:OQk2W3OnEHA.3324@.TK2MSFTNGP15.phx.gbl...
> Thank for the response Ran.
> Most of the time parameters are going to have same value. But I cannot
hard
> code these values. Instead I need to read it from the file[ or Is there
> place I can keep the values for the stored proc parameter.?] and invoke
my
> summary proc.
> So the approach should be, the SP which is feeding the value should be
> scheduled which intern call the summary procedure. Let me know if you have
> any thoughts...
>
> "Quentin Ran" <xyz@.abc.com> wrote in message
> news:ezt3LrOnEHA.536@.TK2MSFTNGP11.phx.gbl...
> > If the procedure you need to run have changing parameters' values, what
> > application supplies the parameters' values? That application should be
> the
> > job scheduled (within SQL server or outside).
> >
> > If you have a few sets of such values that are fed to the same stored
proc
> > to be run at different time, you can create separate jobs, each has its
> own
> > schedule and parameter values.
> >
> >
> >
> > "prabhu" <> wrote in message
> > news:uvHi57LnEHA.2216@.TK2MSFTNGP10.phx.gbl...
> > > I had stored procedure[this read the data from couple of table and
> > summarize
> > > them based on the input paramter] which needs to be executed for every
> > half
> > > hour.I need to pass some input parameter to that proc. I am planning
to
> > > schedule this proc using below system procs
> > > sp_add_jobschedule
> > > sp_add_job
> > > I need to pass some input parameter to the stored proc. I need give
> start
> > > interval and end interval and some configurable values[int 1...int 5)
to
> > > filter out columns. These values can be modifiable by the end user
> > > i.e exec my _storedpoc(startinterval, endinterval, int1, int2, int3,
> > > int5...)
> > > How do I pass this input params to my stored proc, when I shceduled .?
> > > Is it the right approch to do this kind of summary procedure ?
> > > Thanks in advance for your thoughts and comments appreciate it
> > >
> > > prabhu
> > >
> > >
> > >
> > >
> >
> >
>

Wednesday, March 7, 2012

schedule job to set database to single user mode

Task Summary:
I have a remote user to sending records every 5 minutes by DTS package.
I think the best way to handle this is to create a job that will up the
database
into single user mode, set the remote user to the single user.
allow the job to run 10 to 15 minutes then take it out of single user mode.
Task Break down:
1:
Put the database into single user mode.
assign myself as the user.
(How do I define which user has access?)
2:
Backup the database
unassign myself as the single user
assign remote user as the single user
3:
Scheduled the job to execute for 15 minutes
4:
take database out of single user mode
5:
Schedule job to execute evey 6 hours.Hi
"mj" wrote:
> Task Summary:
> I have a remote user to sending records every 5 minutes by DTS package.
> I think the best way to handle this is to create a job that will up the
> database
> into single user mode, set the remote user to the single user.
> allow the job to run 10 to 15 minutes then take it out of single user mode.
>
> Task Break down:
> 1:
> Put the database into single user mode.
> assign myself as the user.
> (How do I define which user has access?)
> 2:
> Backup the database
> unassign myself as the single user
> assign remote user as the single user
> 3:
> Scheduled the job to execute for 15 minutes
> 4:
> take database out of single user mode
> 5:
> Schedule job to execute evey 6 hours.
>
You can not assign another user to be the single user in single user mode!
If you are not connected to the database when it is set in single user mode
then potentially anyone could get in and be that single user.
I am not sure why the remote user is send things every 5 minutes and you
will only want him to send something for a 15 minute period every 6 hours.
What may be a better scenario is that every 6 hours you fetch the information
from the remote location and then processes it in one batch, then the process
is controlled by the server. A different approach you be to have a second
database that the user updates (local or remote) and then use replication to
merge the differences. With SQL 2005 service broker may possibly be useful.
John|||What is the justification for this attempt to "lock the database into
single-user mode for a specific user"'
--
TheSQLGuru
President
Indicium Resources, Inc.
"mj" <mj@.discussions.microsoft.com> wrote in message
news:137E0713-D3ED-4915-95CD-E4CD4D766A57@.microsoft.com...
> Task Summary:
> I have a remote user to sending records every 5 minutes by DTS package.
> I think the best way to handle this is to create a job that will up the
> database
> into single user mode, set the remote user to the single user.
> allow the job to run 10 to 15 minutes then take it out of single user
> mode.
>
> Task Break down:
> 1:
> Put the database into single user mode.
> assign myself as the user.
> (How do I define which user has access?)
> 2:
> Backup the database
> unassign myself as the single user
> assign remote user as the single user
> 3:
> Scheduled the job to execute for 15 minutes
> 4:
> take database out of single user mode
> 5:
> Schedule job to execute evey 6 hours.
>
>|||Thanks John and SQLGuRu for the interest;
More Background Details:
The remote user has developed an extensive DTS package.
When the transformations have been completed, then the transformed
data is sent to a central server.
For this reason I can not just go get the data.
To ensure the migration is completed without interuption, I need to put the
server into single user mode.
To preserve the data prior to the migration, I need to perform a backup.
My current solution looks like this:
----
Procedure MySolution AS
Alter database Set Single_User
Perform back up of database
perform backup of logs
alter database Set Multi_User
End Procedure
Create Job
Call Procedure Mysolution
Schedule Job 6hrs
----
"TheSQLGuru" wrote:
> What is the justification for this attempt to "lock the database into
> single-user mode for a specific user"'
> --
> TheSQLGuru
> President
> Indicium Resources, Inc.
> "mj" <mj@.discussions.microsoft.com> wrote in message
> news:137E0713-D3ED-4915-95CD-E4CD4D766A57@.microsoft.com...
> >
> > Task Summary:
> > I have a remote user to sending records every 5 minutes by DTS package.
> > I think the best way to handle this is to create a job that will up the
> > database
> > into single user mode, set the remote user to the single user.
> > allow the job to run 10 to 15 minutes then take it out of single user
> > mode.
> >
> >
> > Task Break down:
> >
> > 1:
> > Put the database into single user mode.
> > assign myself as the user.
> > (How do I define which user has access?)
> >
> > 2:
> > Backup the database
> >
> > unassign myself as the single user
> >
> > assign remote user as the single user
> >
> > 3:
> >
> > Scheduled the job to execute for 15 minutes
> >
> > 4:
> > take database out of single user mode
> >
> > 5:
> > Schedule job to execute evey 6 hours.
> >
> >
> >
> >
>
>|||Hi
"mj" wrote:
> Thanks John and SQLGuRu for the interest;
>
> More Background Details:
> The remote user has developed an extensive DTS package.
> When the transformations have been completed, then the transformed
> data is sent to a central server.
> For this reason I can not just go get the data.
> To ensure the migration is completed without interuption, I need to put the
> server into single user mode.
> To preserve the data prior to the migration, I need to perform a backup.
> My current solution looks like this:
> ----
> Procedure MySolution AS
> Alter database Set Single_User
> Perform back up of database
> perform backup of logs
> alter database Set Multi_User
> End Procedure
> Create Job
> Call Procedure Mysolution
> Schedule Job 6hrs
> ----
>
> "TheSQLGuru" wrote:
> > What is the justification for this attempt to "lock the database into
> > single-user mode for a specific user"'
> >
> > --
> > TheSQLGuru
> > President
> > Indicium Resources, Inc.
> >
> > "mj" <mj@.discussions.microsoft.com> wrote in message
> > news:137E0713-D3ED-4915-95CD-E4CD4D766A57@.microsoft.com...
> > >
> > > Task Summary:
> > > I have a remote user to sending records every 5 minutes by DTS package.
> > > I think the best way to handle this is to create a job that will up the
> > > database
> > > into single user mode, set the remote user to the single user.
> > > allow the job to run 10 to 15 minutes then take it out of single user
> > > mode.
> > >
> > >
> > > Task Break down:
> > >
> > > 1:
> > > Put the database into single user mode.
> > > assign myself as the user.
> > > (How do I define which user has access?)
> > >
> > > 2:
> > > Backup the database
> > >
> > > unassign myself as the single user
> > >
> > > assign remote user as the single user
> > >
> > > 3:
> > >
> > > Scheduled the job to execute for 15 minutes
> > >
> > > 4:
> > > take database out of single user mode
> > >
> > > 5:
> > > Schedule job to execute evey 6 hours.
I can only assume that this is not a system with users, as a period of
unavailability every 6 hours is not the sort of service level that would be
classed as acceptable!!
Who do you need to load this every 6 hours?
Have you considered replication?
If you have a proper sequence of log backups you may not need to do the full
backup if you accept that you will need to restore the last full backup and
roll forward to return to the state prior to your process running.
Alternatively a differential backup would remove the need to restore some of
the log backups.
If you set the database into single user mode, then you can not guarantee
getting access to the database (for that single user) in subsequent job steps.
What do you do with the files that the process has transferred?
John